The 2 Brahms building recladding & retrofit significantly reduces carbon footprint and greatly improves occupant comfort - designed to achieve a total of 44% in energy consumption as well as 56% in GHG reduction. The resulting design provides excellent energy optimization and durability. The project started with simultaneous and parallel design and analysis operations. Detailed in-situ systems review and calibrated energy simulation led to best value retrofit options. Design charrettes that engaged stakeholders and project leadership established the project design space: what was feasible, and what was desirable. The design implements best practice unit-based energy recovery ventilation systems to maximize indoor environmental quality.

In construction

Status


Project Team

Principal-in-Charge: Kevin Stelzer; Project Architect: Kevin Pu

Structural, Mechanical, Electrical, Envelope, Energy Simulation: Morrison Hershfield

Code: LMDG


Area of Work

7,500 m2

44% energy reduction

Description

56% GHG reduction


Client

Toronto Community Housing Corporation

east elevation

before

after

construction photos and mockups